초록 close

Rail network authority have to do the safety ensuring activities including the maintenance of railway facilities, integrated performance verification between the facilities and related rolling stock and safety inspections, etc. When constructing the new lines or upgrading the conventional lines, full system commissioning should be done before the revenue service with railway operator. To develop the optimal full system commissioning model, the status of domestic and foreign railway facilities and railway accidents are analysed and the problems of the safety management are derived. As one of countermeasures for the problems, the procedures and criteria for the full system commissioning are developed.