In Korea construction project cases, architectural construction project is curtailed production because information network process within multidisciplinary isn't interface. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. Therefore the final object of this study is to propose the establishment method of decision support process for the cooperative design in order to provides improved design coordination and optimize the building system.